18/09/2026 To Chloe Roissetter from David Morgan ACIEH, Environmental Health Consultant



What It States

  • Odour Assessment Accepted: The consultant accepts the findings of the AS Modelling & Data Limited odour report (13 May 2026), which states the expansion will likely reduce odour impacts compared to the current setup and requires no extra mitigation.

  • Dust Assessment Accepted: The airborne particulate report (19 May 2026) is accepted; noticeable dust is unlikely except very close to the gable end fans, and no extra mitigation is needed.

  • Noise Assessment Accepted: The Matrix Noise Impact Assessment (8 June 2026) is accepted; the specified ventilation system is unlikely to cause unacceptable noise at nearby homes if installed and run as described.

  • CEMP Approval: The Connops Construction Environmental Management Plan (CEMP) dated 9 July 2026 is officially accepted as adequate for managing demolition and construction impacts.

  • EA Permitting Controls: The site's upcoming Environment Agency Environmental Permit will formally control and enforce conditions regarding odour, dust, and noise emissions.



What It Asks For

  • Ventilation Condition: A planning condition requiring the building ventilation systems to be installed, operated, maintained, and retained exactly as specified in the June 2026 noise report.

  • Phase 1 Contaminated Land Condition: A pre-commencement condition requiring a Phase 1 Preliminary Risk Assessment Report (including a site walkover) to be submitted and approved in writing before any site clearance or construction begins.

  • Phase 2 and Remediation Framework: If Phase 1 identifies risks, a proposal for a Phase 2 intrusive survey and a subsequent remediation/verification scheme must be approved by the Local Planning Authority (LPA).

  • Unexpected Contamination Clause: A condition requiring all work to stop immediately and the LPA to be contacted if any unaddressed ground or groundwater contamination is discovered during development.

  • CEMP Compliance Condition: A condition ensuring the approved Connops CEMP is complied with in full and actively monitored throughout the demolition and construction phases.



Email I have reviewed this application in relation to Environmental Protection matters and comment as follows: 1 Environment Agency Permit Operation of the proposed development will require and be subject to compliance with an Environmental Permit issued by the Environment Agency under the provisions of the Environmental Permitting Regulations 2016. The Environmental Permit will include conditions relating to pollution control including with respect to the control of odour, dust and noise emissions. The Environment Agency may therefore wish to add to the comments I provide below regarding odour, dust and noise impacts. 2 Odour Impacts I have reviewed the AS Modelling & Data Limited odour assessment report dated 13 May 2026. The report presents the results of an assessment of odour impacts associated with existing conditions and the proposed development having regard to relevant standards and guidance. The assessment takes account of the detailed proposed operating conditions and finds that the proposals are likely to reduce odour impacts compared with the existing situation. No unacceptable odour impacts are predicted to arise if the development goes ahead and no specific additional odour mitigation measures are found to be necessary. I accept the findings of the report. I anticipate that the odour control conditions detailed within the assessment report will be subject to implementation under the terms of the Environmental Permit for the site in due course. Given the above, I have no further comments on this issue. 3 Dust Impacts CAUTION: This email originated from outside North Devon Council. Do not click links or open attachments unless you recognise the sender and know the content is safe. 2 I have reviewed the AS Modelling & Data Limited Assessment of Airborne Particulate Matter report dated 19 May 2026. The report presents the results of an assessment of particulate matter emissions and associated impacts for the proposed development having regard to relevant standards and guidance. The assessment takes account of the detailed proposed operating conditions and finds that the proposals are unlikely to produce any unacceptable impacts. The report states that noticeable dust accumulations are unlikely to occur except perhaps in very close proximity to the gable end fans. No specific additional mitigation measures were found to be necessary. I accept the findings of the report. I anticipate that the particulate emission control conditions detailed within the assessment report will be subject to implementation under the terms of the Environmental Permit for the site in due course. Given the above, I have no further comments on this issue. 4 Noise Impacts I have reviewed the Matrix Noise Impact Assessment report dated 8 June 2026. The report describes a BS4142: 2014 based assessment of noise impact associated with operation of the proposed ventilation system. The assessment is based on operation of a specified ventilation system incorporating specific fans and associated system elements. The report concludes the specified system is unlikely to create any unacceptable noise impacts at nearby residential receptor locations and no additional noise mitigation measures are considered necessary. I accept the findings of the report and consider that unacceptable noise impacts are unlikely to arise provided the system is installed and operated as specified and described within the noise report. I recommend any permission includes a condition to the effect that building ventilation systems serving the approved development shall be installed and operated as specified and described within the Matrix Noise Impact Assessment report dated 8 June 2026 and the approved systems shall be retained and maintained as approved throughout the life of the development. 5 Land Contamination In order to ensure that any potentially significant contamination risks associated with development of this previously developed site are adequately addressed, I recommend the following conditions be included: - Contaminated Land Phase 1 Condition 3 Prior to the commencement of any site clearance, groundworks or construction, the local planning authority shall be provided with a Phase 1 Preliminary Risk Assessment Report for potential ground contamination for written approval. The report shall be prepared by a suitably qualified competent person, have regard to relevant standards and guidance, include a site walkover assessment and be sufficient to identify any and all potential sources of ground contamination affecting any part of the development site. Thereafter, based on the findings of the Phase 1 assessment, a proposal for any Phase 2 (intrusive) survey that may be required shall be presented to and agreed with the planning authority. Where remediation of any part of the site is found to be required, a remediation scheme shall be submitted to and be approved in writing by the local planning authority. The scheme shall include details of any necessary quality assurance, verification and certification requirements in accordance with established best practice. The construction phase of the development shall be carried out in accordance with the agreed details and, where relevant, verification reports and completion certificates shall be submitted for the written approval of the local planning authority. Reason: To ensure that risks from land contamination to future users of the land and neighbouring land, together with those to controlled waters, property and ecological systems are identified and, where necessary, contamination remediation works are undertaken in accordance with the National Planning Policy Framework. - Contaminated Land (Unexpected Contamination) Condition Should any suspected contamination of ground or groundwater not previously addressed within Local Planning Authority approved reports be encountered during development of the site, the Local Planning Authority shall be contacted immediately. Site activities within that sub-phase or part thereof shall be temporarily suspended until such time as a procedure for addressing the contamination is agreed upon with the Local Planning Authority or other regulating bodies. Reason: To ensure that any contamination exposed during development is addressed in accordance with the National Planning Policy Framework 6 Construction Phase Impacts The Connops Construction Environmental Management Plan (CEMP) dated 9 July 2026 is acceptable from an Environmental Health perspective. I recommend a condition along the following lines be included on any permission to ensure demolition and construction related impacts are managed and controlled as described in the CEMP: - Construction Environmental Management Plan Condition 4 The approved Connops Construction Environmental Management Plan dated 9 July 2026 and associated plans shall be complied with in full and be monitored by the applicants to ensure continuing compliance throughout the demolition and construction phases of the development. Reason: To minimise the impact of demolition and construction related works in the interests of highway safety and to safeguard the health and amenities of local residents and the area. Regards, David David Morgan ACIEH Environmental Health Consultant

 
 