22/09/2026 From Mel Southwell, DCC Planning Team to Sheena Hare, Planning Support Officer



What It States

  • Waste Audit Statement: The Waste Planning Authority (WPA) notes that a Waste Audit Statement (WAS) was submitted in support of this major planning application.

  • Construction Waste Prevention: The WAS identifies specific measures to avoid construction waste, specifically noting that only the required materials will be ordered for building construction.

  • On-Site Reuse and Recycling: A cut and fill approach will be used to reuse excavated soils on-site, allowing 33,400 tonnes of the total 66,800 tonnes of generated waste to be recycled on-site.

  • Demolition Disposal: The existing buildings on-site will be demolished, and that specific waste will be disposed of through a licensed waste removal contractor.

  • Information Gaps: The current WAS fails to detail the volume of material going to disposal, the names and locations of the waste disposal sites, and the justification for why this demolition waste cannot be managed more sustainably.


What It Asks For

  • Updated Document: The WPA requests that the Waste Audit Statement is updated to explicitly include the missing disposal volumes, facility names, locations, and sustainability justifications.

  • Resubmission Notification: The authority requests to be officially notified upon the resubmission of the updated statement.


Email

Thank you for consulng the Waste Planning Authority in relaon to this major planning applicaon. The Waste Planning Authority notes that a Waste Audit Statement (WAS) has been submied in support of this applicaon. This statement idenfies measures to be taken to avoid construcon waste occurring as it’s noted that only required materials will be ordered for the construcon of the proposed buildings. Addionally, it is noted that a cut and fill approach will be ulised to enable excavated soils to be reused for the proposed development. The WAS details that 33,400 tonnes of the 66,800 tonnes of waste generated will be recycled on site. However, the WAS details that the exisng buildings on site will be demolished with waste disposed of through a licenced waste removal contractor. The WAS does not detail how much material will go to disposal nor does it provide the name(s) and locaon(s) of the waste disposal site(s), and jusficaon as to why this waste cannot be managed more sustainably. The WPA would request that the WAS is updated to include this informaon and we are nofied on resubmission. Any quesons, please do not hesitate to ask.

 
 