The site sits over groundwater that the applicant’s own permit papers class as highly vulnerable, inside a drinking water (surface water) protection zone and a surface water Nitrate Vulnerable Zone. Yet the application gives no water source, no groundwater risk assessment, and no water monitoring. This article separates what the application says from what is unknown. It does not claim the farm would cause a water shortage, because the evidence to test that has not been provided.


What the application confirms

  • Groundwater vulnerability: High. The Site Condition Report also confirms a Secondary A aquifer below the site, surface water Nitrate Vulnerable Zone status and a drinking water (surface water) protection zone. None of this appears in the planning documents put to the council, which mention Nitrate Vulnerable Zones only in general terms.

  • Fast drainage. The Environmental Statement (paras 7.2.4 and 7.2.6) records an infiltration rate of 0.837 metres an hour, on freely draining soil. The drainage drawing shows a second test pit at 0.296 metres an hour, which the Environmental Statement does not mention. Water, and whatever it carries, reaches the ground below quickly.

  • An infiltration basin†. Water from the roofs, yards and access road would drain through swales to a basin with a base of about 830 m², holding up to 984 m³, plus a soakaway, all designed to soak water into the ground. Some roof water would first be collected in a 100,000-litre tank for washing down.

  • A watercourse on site. The Environmental Statement says “the nearest watercourse to the site is an existing ditch in the south west of the site”. It is assessed for flood risk only. The application form answers “No” to whether the proposal is within 20 metres of a watercourse, and the construction plan puts the nearest watercourse “over 200m away”.

  • No monitoring. The Site Condition Report says: "No monitoring will be undertaken at the installation."


Water demand

Apart from a 100,000-litre rainwater harvesting tank, no document says where the farm’s water would come from or how much it would use. Industry guidance can give a sense of scale. These are estimates, not the applicant’s figures:

  • Breeder guidance (Aviagen) puts normal drinking at 1.6 to 1.8 litres per kg of feed. If all 176,000 birds stayed to day 38, they would eat about 680 tonnes of feed per cycle; the applicant’s 26 feed lorries of up to 28 tonnes allow up to about 730 tonnes. That means up to about 1.1 to 1.3 million litres of drinking water per cycle.

  • By the end of a cycle, drinking water alone would be about 36,000 to 62,000 litres a day, depending on how many birds have been thinned. That is roughly what 250 to 440 people use.

  • The applicant’s dust plan relies on misting systems to control dust, but gives no volume.


Pollution pathways

Water could carry pollution from the site in four main ways:

  1. Roof and yard run-off. Dust from the fans settles on roofs and yards. Rain washes it into the swales and basin, and from there into the ground. Run-off from a poultry unit can carry ammonia, nutrients and microbes. The drainage design rates pollution removal with a generic industry table, not a site-specific assessment.

  2. Dirty water. Wash water from the sheds goes to two tanks whose stated size differs between paragraphs of the same document, and which the odour plan calls “aboveground” while other documents say underground (Article 5).

  3. Spills. The permit papers list red diesel, about 20,000 litres of gas stored at any time, 13 disinfectant and biocide products including formalin (about 480 litres a year), and two pesticides, including the herbicide Roundup.

  4. Manure spreading. Manure spreading. If litter is spread locally (Article 6), nutrients and residues could reach streams feeding the River Bray, and on via the River Mole to the River Taw.


The Flood Risk Assessment and drainage report the application refers to have not been seen by the author.


A river already under pressure

The farm would not be the only pressure on the River Bray. Brayford Sewage Treatment Works, run by South West Water, has a storm overflow that discharges into the river when the works cannot cope, mostly in wet weather. Water company returns show it spilled 172 times in 2025, for about 3,760 hours in total, roughly five months. In 2024 it spilled 205 times, for about 4,510 hours. The works lies downstream of the village and discharges near the trout ponds at Acorn Retreat.


This is not the applicant’s doing, and it is not a reason in itself to refuse the farm. But the application treats the local water environment as if it starts clean. As with the quarry and dust (Article 3), the farm’s run-off and any locally spread litter would add to a river that is already carrying an unassessed load from both SOuth West Water and upstream farms.


Private water supplies

The application contains no survey of private springs, wells or boreholes. The author's mapping shows that the site’s watercourse runs towards a well and spring serving Braycross Cottages, and on towards The Old Post Office. If that is right, there are private water users downstream of a site whose operator has committed to no water monitoring at all. Numerous springs, streams and ditches are shown on Ordnance Survey and MAGIC maps around the village; none of them is mentioned in the application.


What remains uncertain

Question

Application answer

Where the farm's water would come from

Not stated

How much water the farm would use, including misting

Not stated

Groundwater risk assessment

Not submitted/unseen

Flood Risk Assessment and drainage report

Referred to, not supplied/unseen

Water quality baseline for the on-site watercourse

None

Private water supplies nearby

Not surveyed

Where foul sewage from the treatment plant would discharge

Not stated; the form answers "Unknown" on connecting to existing drainage